Fingrid tests of Emaldo® batteries have now been conducted for the reserve market

Fingrid’s tests for participation in the frequency reserve market for Emaldo® batteries were successfully completed on January 11-14, 2025.

Next, Emaldo® processes all the test data from the various sites to Fingrid for actual approval. The approval process at Fingrid takes a maximum of 8 weeks.

A more detailed description of the process can be found here.

In other words, customers will soon be able to enjoy reserve market returns on their Emaldo® devices. Before this, Emaldo® pays a fixed fee of €150/month/device.

Panels and electric car charging as a package

8.11.2021

Solar power and electric car charging go hand in hand. Especially if they are installed at the same time, which reduces the relative amount of…

Energy renovation decision maker – are you leaving hundreds of thousands of euros in savings on the table?

20.10.2021

Energy-inefficient buildings are one of the biggest polluters on our planet. Energy renovations are being carried out at an accelerating rate, which is a good…

15 months with solar panels – was it worth it?

21.9.2021

I sit outside on the wall eating lunch, the autumn sunshine warming my face. I look up at the roof, as I have so many…

New solar panel packages to celebrate autumn

17.9.2021

Autumn is approaching and the peak installation season for solar panels is winding down. However, solar panels still produce a fair amount of energy in…

Smart energy renovation references

29.8.2021

Smart energy renovation is a revolutionary service that combines artificial intelligence with energy renovation project planning, which calculates over 30,000 different combinations of measures for…

Profit even in November

30.5.2021

If someone had previously put the words Kaustinen, November and solar heat in the same sentence, I would probably have laughed them out of the…