We are pleased to announce that Energio will deliver solar panels to the roofs of three buildings at Tripla Workery. A total of 516 solar panels will be installed during October 2024.
The site is a great challenge due to its height and location in one of the most central locations in Helsinki. This poses challenges in terms of both lifting and wind loads.

The lifting equipment required a large reach for lifts at night.
Thank you to Newsec and our partners for this opportunity.
Panels and electric car charging as a package
Solar power and electric car charging go hand in hand. Especially if they are installed at the same time, which reduces the relative amount of…
Energy renovation decision maker – are you leaving hundreds of thousands of euros in savings on the table?
Energy-inefficient buildings are one of the biggest polluters on our planet. Energy renovations are being carried out at an accelerating rate, which is a good…
15 months with solar panels – was it worth it?
I sit outside on the wall eating lunch, the autumn sunshine warming my face. I look up at the roof, as I have so many…
New solar panel packages to celebrate autumn
Autumn is approaching and the peak installation season for solar panels is winding down. However, solar panels still produce a fair amount of energy in…
Smart energy renovation references
Smart energy renovation is a revolutionary service that combines artificial intelligence with energy renovation project planning, which calculates over 30,000 different combinations of measures for…
Profit even in November
If someone had previously put the words Kaustinen, November and solar heat in the same sentence, I would probably have laughed them out of the…
