A surprising number of companies have missed the fact that, according to regulations, non-residential buildings with more than 20 parking spaces are required to install an electric car charging point by December 31, 2024 at the latest .
In this article, I will explain who is subject to the installation obligation. However, please note that the article is not an official decision and does not exempt the owner from liability under Section 7 of the Charging Act, even if the property is not covered by the obligation.
Who is subject to the obligation to install an electric car charging point?
The requirement to install an electric car charging point applies to companies whose buildings use energy to maintain the indoor climate, such as heating or cooling, and which have more than 20 parking spaces inside the building or on the same property.
Exceptions include:
- Residential buildings where more than half of the floor area is for residential use.
- Buildings without energy to maintain the indoor climate (e.g. warehouses).
- Defense Administration buildings .
- Micro-enterprises with fewer than 10 employees and an annual turnover of less than 2 million euros.
- However, the exemption for micro-enterprises only applies when both the owner and the user of the building are micro-enterprises. For example, a property owned by a micro-enterprise but used by someone other than a micro-enterprise is still subject to the obligation.
- Properties owned by micro-enterprises where more than one micro-enterprise is the user will be reviewed on a case-by-case basis.
On Traficom’s website, you can also assess whether the property is covered by the obligation.

The electric car charging point we installed on the wall of the parking garage
Charging point requirements
- must be intended for charging an electric car
- charging point power over 3.7kW
- equipped with Type2 or CCS connector, depending on the charging point’s characteristics
- A public charging point in accordance with the Act on the Distribution of Alternative Fuels for Use in Traffic can also be used as a charging point.
Communication about the obligation has been surprisingly minimal. I dare say that many companies are not even aware of the existence of the obligation, and that they will be in a hurry to fulfill it. Traficom announces that it will start monitoring the obligation as soon as January.
Contact us and make sure that the obligation does not catch your property by surprise!
Energio will supply solar panels to be installed on the facade of the Mylly Shopping Center.
Mylly Shopping Center has been renovated as a green shopping center. The shopping center already has about 1,200 solar panels on its roof and has…
Pilot projects for colored solar panels
Solar panels don’t have to be boring black. Nowadays, solar panels are available where the glass on the front of the panel is tinted, creating…
Colored solar panels
Why do solar panels always have to be black? Not in our opinion. We now offer 1722×1134 mm solar panels in four different colors: red,…
Why is now the best time to buy solar panels?
Interest rates have risen, construction is slowing, and electricity prices have fallen. However, we strongly believe that now is the best time to buy solar…
The energy community multiplies the solar power of housing companies and companies
A housing company, or any electricity producer with multiple usage locations on the same electricity connection, such as a hall share, shopping center, campus area,…
Electricity prices have fallen, is solar power still worth it?
Recently, there has been news about falling electricity prices, negative electricity prices, falling electricity futures, high interest rates, etc. The question arises, is it still…
