Electric car charging point – Mandatory by December 31, 2024!

A surprising number of companies have missed the fact that, according to regulations, non-residential buildings with more than 20 parking spaces are required to install an electric car charging point by December 31, 2024 at the latest .

In this article, I will explain who is subject to the installation obligation. However, please note that the article is not an official decision and does not exempt the owner from liability under Section 7 of the Charging Act, even if the property is not covered by the obligation.

Who is subject to the obligation to install an electric car charging point?

The requirement to install an electric car charging point applies to companies whose buildings use energy to maintain the indoor climate, such as heating or cooling, and which have more than 20 parking spaces inside the building or on the same property.

Exceptions include:

  • Residential buildings where more than half of the floor area is for residential use.
  • Buildings without energy to maintain the indoor climate (e.g. warehouses).
  • Defense Administration buildings .
  • Micro-enterprises with fewer than 10 employees and an annual turnover of less than 2 million euros.
  • However, the exemption for micro-enterprises only applies when both the owner and the user of the building are micro-enterprises. For example, a property owned by a micro-enterprise but used by someone other than a micro-enterprise is still subject to the obligation.
  • Properties owned by micro-enterprises where more than one micro-enterprise is the user will be reviewed on a case-by-case basis.

On Traficom’s website, you can also assess whether the property is covered by the obligation.

The electric car charging point we installed on the wall of the parking garage

Charging point requirements

  • must be intended for charging an electric car
  • charging point power over 3.7kW
  • equipped with Type2 or CCS connector, depending on the charging point’s characteristics
  • A public charging point in accordance with the Act on the Distribution of Alternative Fuels for Use in Traffic can also be used as a charging point.

Communication about the obligation has been surprisingly minimal. I dare say that many companies are not even aware of the existence of the obligation, and that they will be in a hurry to fulfill it. Traficom announces that it will start monitoring the obligation as soon as January.

Contact us and make sure that the obligation does not catch your property by surprise!

Energio will deliver solar panels to the roof of Tripla Workery

1.10.2024

We are pleased to announce that Energio will deliver solar panels to the roofs of three buildings at Tripla Workery. A total of 516 solar…

Electric car charging point – Mandatory by December 31, 2024!

5.9.2024

A surprising number of companies have missed the fact that, according to regulations, non-residential buildings with more than 20 parking spaces are required to install…

Solar panel – Up to over 20% return on your money

3.9.2024

Solar energy has become a popular way to save money and reduce your carbon footprint. But how profitable is it to invest in solar panels…

Green Loan and EIF Guarantee – The Forgotten Financing Solutions for Energy Solutions

14.4.2024

In energy procurement by companies and housing companies, the arrangement of financing often plays a major role in both the implementation and profitability of the…

Hybrid panels enable better geothermal energy

7.4.2024

Are you planning geothermal heating, but the geothermal wells do not fit on the plot, the wells of the existing geothermal system are cooling down,…

Solar panels are always a good investment for a household

20.3.2024

Below is a statement from the Finnish Solar Energy Association regarding the transition to quarter-hourly billing and the changes it causes in solar power systems.…