Amertate Wind Farms

The world's quietest wind turbine developed and manufactured in Finland

Exclusive in Finland.

default

A wind turbine produces a lot for its power

The yield of wind turbines will surprise those used to solar panels in particular. If a 5 kW solar power plant in Finland produces 4.8 MWh of electricity per year under optimal conditions, a 5 kW wind power plant by the sea produces up to 25 MWh per year. Inland, the yield is 8-20 MWh.

default

ELY support improves profitability

Support for energy investments on farms is currently 40% of approved costs until 2027.

According to an Ely expert, solar panels, wind turbines and battery solutions are possible targets for support.

The prerequisite is the use of energy in agricultural production activities and the continued profitability of agriculture.

Nimetön malli (82)

Wind power supports solar panels

Wind turbines produce at night, in winter and during rain. That is, when solar panels are not producing much. Small wind turbines also start up at significantly lower wind speeds than large wind turbines. Therefore, they are an excellent support for companies' energy self-sufficiency.

With a combination of wind power and solar panels, it is possible to achieve up to 70% energy self-sufficiency even on farms.

Advantages of Amertatet wind turbines

default

The world's quietest wind turbine

Noise level below 20 dB/10 meters. The wind hums louder, in other words you won't hear the Amertate wind turbine. This makes it suitable for environments where wind power is not usually suitable.

Wind power

Vertical axis wind turbines

A small vertical axis wind turbine designed for rooftops that starts at 1.2 m/s wind. 500, 1000 and 1500 W models. Can be installed densely on a building. A pilot of 30 units is underway at the Port of Kalajoki. Exclusive in Finland.

bb-global

Mast-mounted wind turbines

Our range also includes high-quality mast-mounted wind turbines manufactured in Tallinn with capacities up to 250 kW. They offer an efficient alternative for sites where mast-mounted wind power is possible.

3 x DRAGON -

How the process progresses

The process is easy for you. By contacting us, we will give you an indicative offer to see if it is worth continuing the discussion.

  1. Indicative offer
  2. Site visit
  3. Detailed offer
  4. Funding application
  5. Achievement
  6. Enjoying the profits

 

Experts at your service

We are here for you. We approach renewable and clean energy with the passion it demands.

Requests for quotations, by phone, email or via a quotation request form .